Aerial 3 (1)

CONSTRUCTION UPDATE: February 2026

Kindred is in the final phase of construction for the West Residences and Kindred Hotel, and putting the finishing touches on the lobby area, courtyard and the rooms, getting ready to welcome the first owners, club members and guests. Soon! Stay tuned for an opening day announcement.

Until then, here’s the sneak peek with the aerial video showcasing why Kindred is the perfect ski-in, ski-out location to stay, celebrate or own.

With only a handful of residences still available, now is the time to schedule a private tour of Kindred’s residences or private club. Contact: [email protected].

Hotel room. Desk with Artwork. Feb. 2026 Hot tubs with water. Feb. 10.2026 Artwork Gallery wall. W304

Newsletter Signup

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*

Join our newsletter

Stay up to date with the latest Kindred Resort news.

Close the CTA

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Name*